Some situations require new ways of thinking — and setting up the air conditioners on the roof of the ebm-papst location in Hagenmoos/St. Georgen was one of them. The factory hall is simply too large for conventional setup with a crane. They would have had to build an access road especially for the crane. Instead, they decided to transport the five air conditioners to the roof via helicopter.
from Air Conditioners http://ift.tt/2jHoeyo
This was a really great contest and hopefully I can attend the next one. It was alot of fun and I really enjoyed myself..
ReplyDeletehome depot air conditioners